Giant Hogweed Report for River Tyne 2026

We have reached the end of Year 8 of our River Tyne Giant Hogweed Eradication Programme which has once more been a very successful year in achieving our objective as seen from the “Green Tick” map below.

We were once again able to use the invaluable on-line mapping tool which reminded us where to look for Giant Hogweed plants as at the start of 2026 our map showed us the sightings from 2025. That of course is where the seeds in the ground already are and would be likely to germinate this year.

Many thanks to all our spotters again who got started in April and May and sent in GPS sightings to the dynamic GPS map which began to be populated with 2026 sightings. We are very grateful to Dave Quarendon for managing this unique GPS mapping tool for use by landowners to assist in locating plants to spray.

Map Showing all 2026 sighting

This map allows GPS position sightings to be placed accurately on to the online map   www.elcv.org.uk/HogweedMapTyne

I have been impressed by the continued and improved support of all the landowners. As we begin to see fewer plants each year, we need to remember to check all the areas we have previously for any later germinating seeds.

This year we carried out our “Green Tick” inspection once more in late May rather than early June as we had done in the earlier years. This made final removal of any missed and budded plants easier; so it is helpful, for all landowners to try to get their final spraying all complete by 2nd week in May. This will ensure that any spayed plants are dying by end of May before we carry out our “green tick” inspection.

A special thanks to Chris, Ian, Robert who helped Dave and I with the green tick inspections this year

Any missed or plants sprayed far too late after flowering has occurred are still potentially able to produce a viable seedhead so the heads need to be removed and disposed of safely. Roundup can be sprayed down the cut stem to kill it or by digging out the root.

Because of this, plants left to flower create a huge amount of work compared to timely spraying at the leaf stage.

Remember our maxim no plant must be allowed to flower.

A single flowering plant is capable of producing over 10,000 seeds

This 2026 photo shows the consequence of leaving one plant to flower. Each of these little germinated  plants is a Giant Hogweed plant. As we move nearer towards eradication we need to remember the tragedy of leaving one plant to produce seed.

This year we have continued to get reports from volunteers of Giant Hogweed plants in areas around East Lothian out with our Rivers. This is good because if we can get these areas Giant Hogweed free, it reduces the risks of reinfection into the areas that we have spent years clearing.

It is this combined and consistent effort that will eventually remove Giant Hogweed from the River Tyne and a wider area.

I have concentrated on Giant Hogweed in my comments, but it is important to note that while we have also been dealing very successfully with Japanese Knotweed in the upper and lower stretches of the River Tyne and its tributaries I believe it  now time to be more proactive about eradication of this plant in the remainder of the River Tyne

I hope that as we move to future years that greater emphasis will be given to Himalayan Balsam as it is keen to fill any void in the river edge. My view has always been to encourage landowners to spray it on the way past as we look for Giant Hogweed plants.

Where we have removed Giant Hogweed and Japanese Knotweed it is good to see other flowering plants fill that space that only a few years ago were bare beneath the Hogweed canopy.

It is lovely to get near the river edge to see all these lovely sights now that the Giant Hogweed removal makes access possible

We are once again most grateful to Bayer UK for their continuing support in supplying some Roundup for use by knapsack sprayer licenced landowners.

We have now achieved eight successful years and the lasting legacy of this project is that the landowners who are doing this voluntarily will take ownership of the project for life. Having put in a great deal of effort to get their land Giant Hogweed free, no landowner will allow it to reappear.

Once again in 2026 we managed with everyone’s help to give all 48 miles of the  River Tyne and it’s tributaries a green tick.

The map below showed the status of our River Tyne Project at mid Aug 2026.

A green tick declares that section to be free of any known flowering Giant Hogweed plants. This classification is done after a final inspection of that section and removal of any plants by the landowner or if needed by the volunteers.

Once more this was a truly magnificent feat, and my thanks are due to all the volunteer plant spotters and the Riparian landowners who have carried out this removal with the use of Roundup or spade and finally to a new team of green tick volunteers who have removed the last few remaining flowering plants by spade and bagging the flowering heads.

At the western edges of the Tyne tributaries we get very close to the River Esk so we are glad that a similar Giant Hogweed Eradication Project is now gathering momentum in Year 4 on the entire 70 miles of the River Esk and tributaries. This will reduce the risk of reinfection by seed transported by wind or traffic.

We would like all farming, industrial and development

landowners anywhere in East Lothian, Mid Lothian and West Lothian to start to remove any isolated pockets of Giant Hogweed to reduce the risks to clean areas and to avoid being accused of being a bad neighbour.

This year we have seen a few more areas removed by developer landowners.

Developers need also be aware that transportation of the top 100 mm of soil containing Giant Hogweed seeds from one site to another site except for specialist disposal is an offence. and makes any future soil removal very expensive so eradicating it now will save money later.

We are delivering a truly unique, invasive species, eradication project on the River Tyne which you can all be proud of.

We will achieve our objective and I would once more like to thank everyone who has been involved in this special project.

James Wyllie

Project Co-ordinator

ELCV River Tyne Giant Hogweed Eradication Project

Furthermore…

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus.

Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim.

You should know…

Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus.

Also…

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus.

Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim.

Click here to add your own text

© Friends of the River Tyne Haddington. (Charity No SCO 46978)